Chairman, Ravenscar
Demolition of existing medical centre (two adjoined houses) and construction of new build.
External and internal earthquake remediation and structural strengthening for retail/office blocks at 166 Moorhouse Avenue, Christchurch.
A distinctive development of an aviation institute including both a hangar and training facility, adjacent to the runway at Christchurch airport.
New administration building for Fonterra's diary factory development in Darfield, Canterbury
A significant development on 28,500m2 greenfield site to house new 12,000m2 manufacturing facilities and 1,500m2 offices for kitchen appliance manufacturers Moffat.
The project was a masterplanned upgrade of the entire school in response to the MOE’s Christchurch Schools Rebuild Programme.
The staged project necessitated complex planning to ensure sufficient teaching space was always available and required multiple Certificates for Public Use applications with the Council.
520m2 single-storey contemporary galley and museum space linked by glazed central terrace built on a base-isolated podium above a basement carpark.
A new 1,700m2 community worship facility for combined Crossway Parishes, completed in two stage.
HRS were engaged to strengthen a church building that had suffered earthquake damage (structural cracks, cracks to arches, including the chancel arch, collapse of the porch gable.
Construction of new 2-storey IL4 concrete and masonry substation building (380m2 floor area) including new service tunnels and electrical mains to hospital labs and boiler house.
Construction of two new single-level teaching blocks and all associated services and infrastructure and alterations to existing administration block.
New build fire station (700m2) for the volunteer brigade after the existing station was heavily damaged and subsequently demolished following the Canterbury Earthquakes.
Fitout for Westpac, staged over three floors (3,000m2 total) to create banking call centre, open plan offices, meeting rooms and staff café facilities.
A design and build development, this 2,834m2 building provides temperature controlled process and packing space for manufacture of products, storage and office space.
The substation was a greenfield development for a new 66kV to 11kV substation, adjacent to an existing, to service Rangiora power supply.
HRS provided early contractor involvement on this negotiated project.
HRS works included structural steel, tilt slab, concrete works, joinery, ventilation, roofing and internal framing/walls to allow for the installation of 66/11kV instruments, cabling and connections by Connectics.
Upgrade and extension of existing Burwood Spinal Unit (built in 1979), which suffered significant damage during the Canterbury earthquake sequence.
Demolition of existing teaching spaces and construction of new 2,000m2 classroom block, consisting of teaching and collaborative learning spaces, library and administration spaces.
HRS were engaged originally to undertake the demolition of the existing building, and once completed, won the bid to construct the new classrooms.
HRS provided early contractor involvement on this negotiated project. Creating a large volume warehouse to facilitate La-Z-Boy’s South Island distribution.
HRS gutted the original heavy glass and concrete façade. The refurbishment brings it up to current seismic requirements and the modern fitout and new proprietary curtain wall façade bring it into the 21st century.
The construction of a new carriage wash servicing centre, including inspection pit, refuelling, waste handling and potable water servicing zones and facilities and track works.
The Assessment, Treatment and Rehabilitation (AT&R) secure facility is purpose built to care for people with intellectual disabilities and significantly challenging behaviour.